As a result of a major electrical upgrade, our Ballarat facility now has a future-proofed power supply, enabling us to expand the production and raw materials areas of the plant with new machinery, more capability and better reliability. And no longer will those pesky magpies come flying in to short-circuit the system and close us down for six hours.