Campbelltown City Council in South Australia were looking for a cost effective way to replace the old treated pine barriers along the Fourth Creek catchment as part of the city beautification works. Replas Post and Rail Fencing, using 125 mm bollards, were used to replace the existing installation. Nearly 200 metres of this post and rail was installed in 2018 with a very impressed Campbelltown City Council. Recycled plastic bollards do not rot, rust, crack and never need painting. Like all recycled plastic products, 125 mm bollards require little maintenance while staying durable and long lasting. A great long lasting solution for the council and region, creating a home for recycled plastic products and a Circular Economy.